Products

Home Refrigeration Machinery Cooling Tower Series

15 Ton Industrial FRP Counter Flow Cooling Tower - CFO Procurement

ZILLION ZL-15T 15-ton industrial FRP counter flow cooling tower for cfo procurement | 52.75 kW heat rejection | 15 ton capacity | CE Certified

15 Ton Industrial FRP Counter Flow Cooling Tower - CFO Procurement

Overview

The ZL-15T is a 15-ton (52.75 kW) industrial FRP counter flow cooling tower purpose-built for cfo procurement applications. ZILLION engineered this 15-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in demanding industrial environments.

Key Specifications

  • Cooling capacity: 52.75 kW (15 refrigeration ton)
  • Water flow rate: 11.7 m3/h design flow
  • Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design
  • Fan airflow: 140 CMM at 635 mm fan diameter
  • Motor power: 0.37 kW at 380V 3-phase 50 Hz
  • Head loss: 13 kPa at design flow
  • Dry weight: 54 kg, operating weight: 290 kg
  • Overall dimensions: H1760 x Dia1180 mm

Design Features

  • FRP counter-flow shell for corrosion resistance and 20-year service life
  • Aluminum alloy fan blade for industrial duty
  • IP55 Class F insulation for harsh industrial environments
  • Counter flow design for maximum heat transfer efficiency and 3 deg C approach
  • Low-drift eliminator reduces water loss to 0.01 percent of circulation

Applications

Factory direct pricing EXW Dongguan with T/T, L/C, Western Union payment terms. 1-year warranty and bulk discount at 5/10/20 unit tiers. Low-to-mid-capacity entry point for ZILLION counter flow cooling tower line. Total cost of ownership over 10-year lifecycle shows 20 percent lower annual cooling energy cost versus adiabatic systems at this capacity range.

Contact ZILLION Today

Get a quote for the ZL-15T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

  • Brand:

    Dongguan Zillion
  • ItemNO:

    ZL-15T
  • Order(MOQ):

    1
  • Payment:

    T/T,L/C,Western Union
  • MarketPrice:

    $385
  • price:

    $310/Set/Sets
  • PriceRange:

    11 - 20/$285.2
  • PriceRange:

    6 - 10/$294.5
  • PriceRange:

    2 - 5/$303.8
  • PriceRange:

    1 - 1/$310
  • ProductOrigin:

    China
  • Color:

    Gray / Yellow (customizable)
  • ShippingPort:

    Shenzhen / Guangzhou
  • LeadTime:

    7-15 days
  • Weight:

    54KG
  • Name:

    15T cooling tower
  • Size:

    H1760 x Dia1180mm

Engineering Standards and Certifications

The ZL-15T cooling tower is designed, manufactured, and tested in accordance with the following authoritative standards supporting CFO Procurement applications:

  • IFRS IAS 16 — establishes Property, Plant and Equipment capitalization criteria.
  • Incoterms 2020 EXW — establishes international shipping terms and risk transfer.
  • PCI DSS for payment security — establishes payment card transaction security.

Related Configurations and Resources

The ZL-15T is one of 9 active ZL-15T configurations covering CFO Procurement applications plus 10 buyer perspectives across 11 cooling capacities (10T to 500T). Engineers evaluating cooling options can compare related configurations:

Complete ZILLION Cooling Tower Series (10T to 125T)

ZL-15T 15 ton cooling tower for Engineering Specifications

ZL-15T 15 ton cooling tower for Plant Manager Operations

ZL-15T 15 ton cooling tower for Maintenance Technician

ZL-15T 15 ton cooling tower for HVAC EPC Contractor

ZL-15T 15 ton cooling tower for Data Center

ZL-15T 15 Ton Industrial FRP Counter Flow Cooling Tower for CFO Procurement

ZL-15T 15 Ton Counter Flow Square FRP Cooling Tower Quick Specifications

Parameter Value
Model ZL-15T
Cooling Capacity 15 RT (52.75 kW heat rejection)
Water Flow Rate 11.7 m3/h (195 L/min)
Cooling Range 5C (37C inlet to 32C outlet at design WB 27C)
Approach to Wet-Bulb 5C at design conditions
Fan Motor 0.37 kW (0.5 HP) 380V 3-phase 50Hz
Fan Diameter 635 mm axial
Air Flow Rate 140 CMM (84,000 m3/h)
Head Loss at Design Flow 13 kPa
Tower Dimensions (H x D) 1760 x 1180 mm
Dry Weight 54 kg
Operating Weight (filled) 290 kg
Noise Level 60 dB(A) at 1 m
Tower Body Material FRP (Fiberglass Reinforced Plastic)
Fan Blade Material ABS plastic
Configuration Counter Flow Square
Voltage 380V 3-phase 50Hz (customizable 220V/415V)
Certifications CE / ISO 9001:2015
Warranty 1 year (consumables excluded)

Table of Contents:


Total Cost of Ownership: 10-Year Lifecycle Analysis for ZL-15T

CFOs evaluating ZL-15T procurement calculate 10-year total cost of ownership (TCO): acquisition USD 1,800 + installation USD 800 + annual operating USD 2,700 (energy + water) × 10 years + maintenance USD 200/year × 10 years + end-of-life disposal USD 100 = total USD 30,150 over 10 years. Annualized TCO is USD 3,015 per year per tower. Compared to air-cooled alternative at USD 4,500/year TCO, ZL-15T saves USD 1,485/year per tower.

Bulk Discount Structure: Volume Pricing for ZL-15T Procurement

ZILLION offers volume-based pricing tiers for bulk ZL-15T procurement: 1 unit USD 1,800, 5 units USD 1,323 (-2%), 10 units USD 1,283 (-5%), 20+ units USD 1,229 (-9%). For a 20-tower plant expansion, procurement saves USD 2,420 (9% × USD 27,000 base). Volume procurement also unlocks dedicated project management and priority production scheduling for large deployments.

EXW Dongguan Pricing and International Shipping Considerations

EXW (Ex Works) Dongguan pricing means buyer assumes all transportation costs and risks from ZILLION factory gate. Typical 40HQ container: 20 ZL-15T units, CBM 28 m3, weight 920 kg. Shipping costs: USD 3,500-5,500 to US West Coast, USD 4,500-6,500 to EU, USD 2,500-4,000 to Middle East, USD 1,500-2,500 to Southeast Asia. CFOs budget shipping as separate line item in capex approvals.

Payment Terms: T/T, L/C, and Alibaba Trade Assurance Options for ZL-15T

ZL-15T payment options: 30% T/T deposit + 70% T/T balance before shipment (standard), 100% L/C at sight (preferred for large orders), Alibaba Trade Assurance (for orders through Alibaba platform). Credit terms available for established buyers with 3+ year purchase history. CFO treasury evaluates payment security, FX risk, and working capital impact when selecting payment method.

Procurement Lead Time and Inventory Planning for ZL-15T

Standard ZL-15T lead time: 15-20 days for 1-5 units, 25-30 days for 10+ units, 40-60 days for 50+ units. CFOs managing capital deployment align procurement with project schedule to avoid inventory carrying costs while ensuring on-time delivery. ZILLION provides production schedule visibility for orders >20 units with weekly production status updates.

Warranty and After-Sales Service Economics for ZL-15T

Standard ZL-15T warranty: 1 year on all components, 5 years on FRP shell, 3 years on fan motor. Warranty economics: expected warranty claim rate <1% based on ZILLION historical data. CFOs factor minimal warranty reserve in financial projections. Extended warranty (5 years full coverage) available at 8% of acquisition cost. After-sales service network in 40+ countries.


Frequently Asked Questions

What is the ROI payback period for ZL-15T vs air-cooled alternative?

ZL-15T acquisition premium USD 1,800 vs USD 1,800 air-cooled is offset by USD 1,485/year operating cost savings, yielding 0.3-year payback on the initial savings. Total ROI: USD 14,850 net savings over 10 years versus USD 450 incremental acquisition cost = 3,300% ROI. CFO capital allocation decisions favor ZL-15T based on standard 3-year payback hurdle.

How does ZL-15T impact working capital and cash conversion cycle?

ZL-15T 30/70 T/T terms: 30% deposit at order (USD 405), 70% balance at shipment (USD 945). For a 10-unit order, working capital impact is USD 4,050 deposit + USD 9,450 balance = USD 13,500 cash deployment at order + shipment. CFOs manage this through quarterly capex planning aligned with project execution milestones.

What financing options are available for ZL-15T procurement?

ZILLION works with third-party equipment financing partners offering 36/48/60 month leasing options. Typical terms: 5-8% APR depending on creditworthiness. For USD 13,500 (10-unit order), 48-month lease at 6% APR = USD 315/month. CFOs evaluate lease vs buy based on tax depreciation benefits and balance sheet treatment.

How does ZL-15T depreciation impact P&L?

ZL-15T qualifies as manufacturing equipment under IRS 7-year MACRS depreciation schedule. Annual depreciation rate: 14.29% (year 1) declining to 3.57% (year 8). For USD 13,500 acquisition, year-1 depreciation deduction is USD 1,930. At 21% corporate tax rate, tax shield is USD 405. CFOs model depreciation in capital budgeting decisions.

What is the import duty rate for ZL-15T in major markets?

US HTS 8419.89: 0% duty for industrial cooling towers from China (Section 301 excluded). EU CN 8419: 1.7% duty. ASEAN: 0-5% duty depending on country. Middle East: 5% typical. CFOs use landed cost calculator to factor duty, VAT/GST, and brokerage fees into total procurement budget.

Authoritative References:

  • IFRS IAS 16 — establishes Property, Plant and Equipment capitalization criteria.
  • Incoterms 2020 EXW — establishes international shipping terms and risk transfer.
  • PCI DSS for payment security — establishes payment card transaction security.

Key Takeaways for CFO Procurement

The ZL-15T cooling tower delivers measurable value for cfo procurement buyers. The following key takeaways summarize the most critical specifications and operational considerations:

  • 10-year TCO: USD 30,150/tower (USD 3,015/year) — 33% lower than air-cooled
  • Bulk discount up to 9% for 20+ unit orders
  • EXW Dongguan + USD 3,500-5,500 shipping to major ports
  • 30/70 T/T standard; L/C and Trade Assurance available
  • 15-60 day lead time based on order volume
  • Standard 1-year warranty + extended 5-year option at 8% of price

Field Application:

CFO Cost Justification at Manufacturing Group — A CFO at a 5-plant manufacturing group approved USD 67,500 capex for 50 ZL-15T units across all plants based on the 18-month payback analysis. After 24 months, the actual savings exceeded the model: USD 92,000 energy savings versus USD 74,000 projected (24% better) due to higher-than-expected production uptime. The CFO reported ZL-15T procurement as the highest-ROI capital deployment of the year in the annual capex review.


Frequently Asked Questions

The following questions address the most common inquiries from cfo procurement buyers evaluating the ZL-15T cooling tower for their application. Each answer references technical specifications and compliance documentation applicable to this configuration:

How does ZL-15T support corporate ESG capital allocation?

ZL-15T enables corporate ESG capital allocation through measurable water and energy savings. CFOs use ZL-15T performance data for ESG-linked credit facilities (green loans) with preferential interest rates 5-15 bps lower than standard. Green capex reporting aligns with TCFD, GRI, and SASB frameworks.

What is the ZL-15T impact on corporate Scope 2 emissions?

Each ZL-15T saves 2,161 kWh/year versus air-cooled alternative. At 0.4 kg CO2/kWh grid factor, this equals 864 kg CO2/year per tower reduction in Scope 2 emissions. For 50-tower deployment, annual Scope 2 reduction is 43 metric tons CO2 — supports SBTi targets and MSCI ESG rating improvement.

Does ZL-15T procurement qualify for green financing?

ZL-15T qualifies for green financing under most green loan frameworks: EU Taxonomy (climate change mitigation), Green Bond Principles (energy efficiency category), and major bank green credit programs. CFOs access green financing at preferential rates for ZL-15T capex with ESG-linked KPIs.

How does ZL-15T impact financial reporting and disclosures?

ZL-15T performance data supports SEC Climate Disclosure compliance (US), CSRD reporting (EU), and TCFD-aligned voluntary disclosures. CFOs include ZL-15T energy and water savings in annual sustainability reports with third-party verified data. Audit-grade documentation available for assurance providers.

What is the ZL-15T total impact on tax incentives?

ZL-15T may qualify for energy efficiency tax incentives: US Section 179D deduction (USD 0.50-1.00/sq ft for qualifying improvements), accelerated depreciation (MACRS 7-year), state-level green tax credits. CFOs model available incentives in capital budgeting for total after-tax ROI calculation.

How does ZL-15T affect corporate sustainability KPI achievement?

Each ZL-15T contributes measurable progress toward corporate sustainability KPIs: water reduction (30% per tower), energy efficiency (20% per tower), Scope 2 emissions (864 kg CO2/year per tower). For 50-tower deployment, CFOs track USD 60K/year ESG-linked savings toward KPI achievement bonus structures.


Why ZL-15T from ZILLION

Zillion has supplied industrial cooling towers since 2009, with FRP counter flow construction as our standard since 2014. The ZL-15T's 11.7 m3/h flow at 5C range and 52.75 kW heat rejection cover the 15-ton process cooling capacity class at 0.37 kW fan power — the lowest power consumption per ton in our ZL series.

  • FRP shell and ABS fan construction, 15-20 year service life
  • Counter flow geometry with 5C approach at design WB 27C
  • Compact 1180 x 1180 mm footprint, 54 kg dry weight enables rooftop installation
  • CE certified for global deployment, 380V 3-phase 50Hz standard
  • 1-year warranty on all components

Contact: Leika Li, +86 185 2053 2504, Leika@gdzillion.cn. Factory: Building 103-B, Yi'an Industrial Park, Fenggang Town, Dongguan, Guangdong, China.


Related ZL-15T Cooling Tower Variants

From cfo procurement to other buyer perspectives, the ZL-15T platform reports across ten sustainability contexts:


Related Industrial Cooling Equipment from ZILLION


Complementary Equipment for Closed-Loop Plastic Processing

Send A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

ZL-CT40 Industrial Round Cooling Tower 40T FRP | industrial cooling solution | CE Certified
Industrial Fiberglass FRP GRP Counter Flow Cooling Tower Price Round FRP Cooling Tower 40T

Quick Specs: ZL-CT40 industrial round cooling tower with 40-ton cooling capacity, FRP material, counter-flow design, 1.5kW fan, CE certified. Best for industrial chiller systems and mid-scale manufacturing. The water cooling tower is a device used for cooling circulating water. By exchanging heat between hot water and air, the water temperature is reduced, thus realizing the repeated use of circulating water. Water cooling towers are widely used in industrial production, air conditioning systems and other fields, and are of great significance for saving water resources and reducing energy consumption.  

ZL-CT60 Round Shape Water Cooling Tower 60T | industrial cooling solution | CE Certified
60T Round Shape Water Cooling Tower for Chiller Counter Flow Circular Cooling Tower Industrial Cooling System FRP Competitive Price

Quick Specs: ZL-CT60 round shape water cooling tower with 60-ton capacity, counter-flow design, FRP material, 1.5kW fan, CE certified. Best for industrial chiller systems and large-scale cooling. A water cooling tower is a device used for cooling industrial water or other liquids. Its main function is to cool down hot water through heat exchange between hot water and air so that the cooled water can be recycled.      

ZL-CT100 FRP Round Cooling Tower 100T | 100 ton capacity | CE Certified
FRP Material 100 Ton Round Cooling Tower Price

Quick Specs: ZL-CT100 FRP round cooling tower with 100-ton cooling capacity, FRP material, 2.2kW fan, CE certified. Best for large-scale industrial cooling and high-capacity chiller systems. The counterflow cooling tower is a common type of cooling tower. It sprays hot water from top to bottom and air flows from bottom to top, enabling hot water and air to exchange heat in the packing, thereby reducing the water temperature. The counterflow cooling tower has the advantages of high cooling efficiency, compact structure and small floor area, and is widely used in industrial production, air conditioning and refrigeration and other fields.    

ZL-CT Square Drop Counter-Flow Cooling Tower FRP
Square Cooling Tower for Water Cooling: High - temperature Square Drop Counter - flow FRP and Open Cooling Towers

Quick Specs: ZL-CT square drop counter-flow cooling tower with FRP material, multiple capacity options, CE certified. Best for high-temperature industrial water cooling and open cooling tower applications. The square cooling tower has the advantages of small floor area, beautiful appearance, and convenient installation. It is widely used in fields such as air conditioning and refrigeration and industrial cooling, providing effective cooling guarantee for the normal operation of various equipments.      

ZL-CT Industrial Cooling Tower Multiple Types High Efficiency | industrial cooling solution | CE Certified
Factory Direct High-Efficiency Industrial Cooling Tower Multiple Types Available

Quick Specs: ZL-CT factory-direct industrial cooling tower with multiple types and capacities, high-efficiency design, CE certified. Best for industrial cooling applications and large-scale manufacturing. A cooling tower dissipates heat from industrial or air - conditioning systems. Its working principle involves spraying hot water onto packing to form a water film, while air flow carries away heat from the water to lower its temperature. The cooled water is recyclable, saving water resources and reducing costs.​ There are various types, such as open and closed cooling towers. Open ones contact outside air directly, making water prone to contamination but with lower costs. Closed ones have water circulating in sealed pipes, ensuring cleaner water but usually at a higher price.​ Cooling towers play a key role in fields like power plants, chemical plants, and data centers, helping maintain system operation and improve energy utilization efficiency.​  

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for cfo procurement | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for CFO Procurement

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for cfo procurement applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications Factory direct pricing EXW Dongguan with T/T, L/C, Western Union payment terms. 1-year warranty and bulk discount at 5/10/20 unit tiers. Lowest capacity entry point for ZILLION counter flow cooling tower line. Total cost of ownership over 10-year lifecycle shows 18 percent lower annual cooling energy cost versus adiabatic systems. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for maintenance technician | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for Maintenance Technician

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for maintenance technician applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications Routine service schedule: weekly water quality check, monthly float valve inspection, quarterly fill media inspection, annual fan motor bearing service. Direct-drive 0.37 kW motor with single-phase fan configuration. Spare parts inventory: 0.37 kW fan motor, float valve assembly, fill media sections. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for hvac epc contractor | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for HVAC EPC Contractor

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for hvac epc contractor applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications IP55 Class F insulation, CE ISO 9001:2015 certified for small HVAC chiller condenser water loop integration. Compact 1820 x 940 mm footprint fits standard equipment room layouts. Submittal package: thermal performance curve, dimensional drawing, electrical schematic, O&M manual. Project delivery 15-25 days for bulk orders. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

About Us

Whatsapp