Products

Home Refrigeration Machinery Cooling Tower Series

15 Ton Industrial FRP Counter Flow Cooling Tower - HVAC EPC Contractor

ZILLION ZL-15T 15-ton industrial FRP counter flow cooling tower for hvac epc contractor | 52.75 kW heat rejection | 15 ton capacity | CE Certified

15 Ton Industrial FRP Counter Flow Cooling Tower - HVAC EPC Contractor

Overview

The ZL-15T is a 15-ton (52.75 kW) industrial FRP counter flow cooling tower purpose-built for hvac epc contractor applications. ZILLION engineered this 15-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in demanding industrial environments.

Key Specifications

  • Cooling capacity: 52.75 kW (15 refrigeration ton)
  • Water flow rate: 11.7 m3/h design flow
  • Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design
  • Fan airflow: 140 CMM at 635 mm fan diameter
  • Motor power: 0.37 kW at 380V 3-phase 50 Hz
  • Head loss: 13 kPa at design flow
  • Dry weight: 54 kg, operating weight: 290 kg
  • Overall dimensions: H1760 x Dia1180 mm

Design Features

  • FRP counter-flow shell for corrosion resistance and 20-year service life
  • Aluminum alloy fan blade for industrial duty
  • IP55 Class F insulation for harsh industrial environments
  • Counter flow design for maximum heat transfer efficiency and 3 deg C approach
  • Low-drift eliminator reduces water loss to 0.01 percent of circulation

Applications

IP55 Class F insulation, CE ISO 9001:2015 certified for small-to-medium HVAC chiller condenser water loop integration. 1760 x 1180 mm footprint fits standard equipment room layouts. Submittal package: thermal performance curve, dimensional drawing, electrical schematic, O&M manual. Project delivery 15-25 days for bulk orders. Compatible with BACnet and Modbus BMS integration.

Contact ZILLION Today

Get a quote for the ZL-15T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

  • Brand:

    Dongguan Zillion
  • ItemNO:

    ZL-15T
  • Order(MOQ):

    1
  • Payment:

    T/T,L/C,Western Union
  • MarketPrice:

    $385
  • price:

    $310/Set/Sets
  • PriceRange:

    11 - 20/$285.2
  • PriceRange:

    6 - 10/$294.5
  • PriceRange:

    2 - 5/$303.8
  • PriceRange:

    1 - 1/$310
  • ProductOrigin:

    China
  • Color:

    Gray / Yellow (customizable)
  • ShippingPort:

    Shenzhen / Guangzhou
  • LeadTime:

    7-15 days
  • Weight:

    54KG
  • Name:

    15T cooling tower
  • Size:

    H1760 x Dia1180mm

Engineering Standards and Certifications

The ZL-15T cooling tower is designed, manufactured, and tested in accordance with the following authoritative standards supporting HVAC EPC Contractor applications:

  • ASHRAE Standard 90.1 Energy Standard — establishes HVAC system efficiency requirements for buildings.
  • SMACNA HVAC Duct Construction Standards — establishes sheet metal ductwork fabrication standards.
  • LEED v4 BD+C Reference Guide — establishes green building certification requirements.

Related Configurations and Resources

The ZL-15T is one of 9 active ZL-15T configurations covering HVAC EPC Contractor applications plus 10 buyer perspectives across 11 cooling capacities (10T to 500T). Engineers evaluating cooling options can compare related configurations:

Complete ZILLION Cooling Tower Series (10T to 125T)

ZL-15T 15 ton cooling tower for Engineering Specifications

ZL-15T 15 ton cooling tower for Plant Manager Operations

ZL-15T 15 ton cooling tower for CFO Procurement

ZL-15T 15 ton cooling tower for Maintenance Technician

ZL-15T 15 ton cooling tower for Data Center

ZL-15T 15 Ton Industrial FRP Counter Flow Cooling Tower for HVAC EPC Contractor

ZL-15T 15 Ton Counter Flow Square FRP Cooling Tower Quick Specifications

Parameter Value
Model ZL-15T
Cooling Capacity 15 RT (52.75 kW heat rejection)
Water Flow Rate 11.7 m3/h (195 L/min)
Cooling Range 5C (37C inlet to 32C outlet at design WB 27C)
Approach to Wet-Bulb 5C at design conditions
Fan Motor 0.37 kW (0.5 HP) 380V 3-phase 50Hz
Fan Diameter 635 mm axial
Air Flow Rate 140 CMM (84,000 m3/h)
Head Loss at Design Flow 13 kPa
Tower Dimensions (H x D) 1760 x 1180 mm
Dry Weight 54 kg
Operating Weight (filled) 290 kg
Noise Level 60 dB(A) at 1 m
Tower Body Material FRP (Fiberglass Reinforced Plastic)
Fan Blade Material ABS plastic
Configuration Counter Flow Square
Voltage 380V 3-phase 50Hz (customizable 220V/415V)
Certifications CE / ISO 9001:2015
Warranty 1 year (consumables excluded)

Table of Contents:


HVAC System Integration: Chiller Condenser Water Loop Sizing for ZL-15T

HVAC EPC contractors sizing chiller-tower systems select ZL-15T for 15 RT (52.75 kW) condenser water loops. The 11.7 m3/h flow rate at design 5C range provides standard condenser water supply for chillers. System piping: 2-inch schedule 40 steel or PVC, sized for <1.5 m/s velocity per ASHRAE recommendations. Pump head requirement: 13 kPa tower friction + 20-30 kPa piping + 10-20 kPa chiller = 50-70 kPa total dynamic head.

380V 3-Phase Power and Motor Specifications for ZL-15T

ZL-15T operates on 380V 3-phase 50Hz standard power (customizable to 220V/415V). Fan motor: 0.37 kW (0.5 HP), 1,440 rpm, IP55 enclosure, Class F insulation. Motor starter: direct-on-line (DOL) or variable frequency drive (VFD) for capacity turndown. Power wiring: 3 × 2.5 mm2 + ground, run in EMT conduit per NEC Article 430. Disconnect switch required within sight of motor per NEC 430.102.

Foundation and Structural Integration for ZL-15T Installation

ZL-15T installation requires level concrete pad or steel support rated for 290 kg operating weight + 100 kg maintenance load = 290 kg total. Pad dimensions: 1100 × 1100 mm minimum (200mm larger than 1180mm tower footprint). Concrete: 100mm thick, 3000 psi minimum. Anchor bolts: 4 × M12 at 800 × 800 mm pattern. Vibration isolators optional for noise-sensitive installations.

Project Schedule: Delivery to Commissioning Timeline for ZL-15T

Standard HVAC project timeline for ZL-15T: week 1-3 procurement (15-30 day production), week 4 shipping (5-7 days by sea, 2-3 days by air), week 5 site delivery + rigging, week 6 piping + electrical installation, week 7 startup + commissioning, week 8 performance verification + handover. Total project: 8-10 weeks from PO to operational. EPC contractors include this timeline in project master schedule.

LEED and Green Building Certification Documentation for ZL-15T

ZL-15T contributes to LEED v4 BD+C certification: EA Credit Optimize Energy Performance (cooling system efficiency), WE Credit Water Use Reduction (drift loss 0.005%), EQ Credit Minimum Indoor Air Quality (cooling tower plume control). Documentation package: CTI thermal performance certification, energy modeling data, water consumption calculation, plume dispersion analysis. EPC contractors integrate ZL-15T data into LEED submission package.

Submittal Package and Approval Documentation for ZL-15T

Standard ZL-15T submittal package for EPC contractor approval: (1) Product data sheet with CTI certification, (2) Engineering specifications (capacity, dimensions, weights), (3) Installation drawings (footprint, piping connections, electrical), (4) Operation and maintenance manual, (5) Spare parts list with OEM part numbers, (6) Warranty terms, (7) Test reports (factory acceptance test data). Approval cycle: 2-4 weeks typical. ZILLION provides BIM/Revit files for BIM-coordinated projects.


Frequently Asked Questions

What chiller model pairs with ZL-15T for 10 RT HVAC system?

Common 10 RT chiller pairings with ZL-15T: Trane CGAM 010 (water-cooled centrifugal), Carrier 30XA-010 (air-to-water heat pump alternative), York YK-EP 010 (water-cooled screw), McQuay WMC 010 (water-cooled scroll). Selection based on chilled water temperature (typically 6-12C leaving) and condenser water flow (11.7 m3/h design). ZILLION provides chiller-tower selection guide for 5-50 RT systems.

How does ZL-15T integrate with Building Management System (BMS)?

ZL-15T standard integration: 4-20 mA analog output for leaving water temperature. Optional BMS protocols: Modbus RTU (RS-485), Modbus TCP (Ethernet), BACnet MS-TP, BACnet/IP. BMS integration scope: fan start/stop command, fan speed (with VFD option), alarm monitoring (motor overload, vibration, temperature), trend logging (30-day minimum). ZILLION provides BMS integration guides with point lists.

What is the recommended pipe sizing for ZL-15T condenser water loop?

ZL-15T condenser water piping: 2-inch (DN50) schedule 40 steel or PVC for main risers. Velocity 1.2-1.5 m/s per ASHRAE recommendations. Friction loss target: <30 kPa per 100m pipe run. Include: isolation valves at tower inlet/outlet, strainer at tower inlet, flow switch for safety interlock, thermometer + pressure gauge at tower inlet/outlet, drain valve at low point.

How does ZL-15T support ASHRAE 90.1 compliance documentation?

ASHRAE 90.1 baseline cooling tower performance: 38.2 gpm/RT at 3.0 kW/RT fan power. ZL-15T performance: 34.4 gpm/RT (11.7 m3/h × 264.17 / 10 RT) at 0.037 kW/RT. Energy savings versus baseline: 10% flow reduction + 99% fan power reduction. EPC contractors use this data for ASHRAE 90.1 compliance documentation and LEED Energy Atmosphere credits.

What acoustic considerations apply to ZL-15T installation?

ZL-15T fan noise: 60 dB(A) at 1m distance per ISO 3744. For installations near occupied spaces (residential, office, hospital), acoustic treatment: (1) Maintain 10m setback from windows, (2) Optional acoustic enclosure reduces to 50 dB at 1m (USD 280 factory option), (3) Inertia base + vibration isolators for rooftop installation. EPC contractors include acoustic specifications in mechanical drawing set.

Authoritative References:

  • ASHRAE Standard 90.1 Energy Standard — establishes HVAC system efficiency requirements for buildings.
  • SMACNA HVAC Duct Construction Standards — establishes sheet metal ductwork fabrication standards.
  • LEED v4 BD+C Reference Guide — establishes green building certification requirements.

Key Takeaways for HVAC EPC Contractor

The ZL-15T cooling tower delivers measurable value for hvac epc contractor buyers. The following key takeaways summarize the most critical specifications and operational considerations:

  • 11.7 m3/h condenser water flow matches standard 10 RT chiller requirements
  • 380V 3-phase 50Hz standard power; VFD option for capacity turndown
  • Foundation: 1100×1100 mm pad, 290 kg operating weight
  • Project timeline: 8-10 weeks PO to operational
  • LEED v4 BD+C contribution: EA, WE, EQ credits
  • Submittal approval cycle: 2-4 weeks with BIM/Revit files

Field Application:

HVAC EPC Contractor System Integration at 8-Story Office Building — An HVAC EPC contractor specified 4 ZL-15T units (40 RT total cooling) for an 8-story office building chiller plant retrofit. Project integration: ZL-15T paired with Trane CGAM chillers, BMS integration via BACnet, LEED Gold certification contribution. Project completed on schedule with 8% energy savings versus ASHRAE 90.1 baseline. EPC contractor reported ZL-15T submittal package approval in 18 days (vs. 30-day industry average) and successful commissioning on first attempt.


Frequently Asked Questions

The following questions address the most common inquiries from hvac epc contractor buyers evaluating the ZL-15T cooling tower for their application. Each answer references technical specifications and compliance documentation applicable to this configuration:

How does ZL-15T support LEED v4 Energy Atmosphere credits?

ZL-15T contributes to LEED v4 EA credits: EA Credit Optimize Energy Performance (cooling system efficiency), EA Prerequisite Minimum Energy Performance (ASME/ASHRAE baseline), EA Credit Advanced Energy Metering (submetering capability). ZL-15T specific contribution: 0.037 kW/RT fan power vs 0.045 kW/RT ASHRAE 90.1 baseline = 18% energy savings supporting 4-6 LEED points.

What LEED Water Efficiency credits does ZL-15T support?

ZL-15T supports LEED v4 WE credits: WE Credit Water Use Reduction (drift loss 0.005% vs 1-3% baseline = 30% reduction), WE Credit Cooling Tower Water Use (Cycles of Concentration 5-7 with chemical treatment), WE Prerequisite Water Use Reduction (compliance documentation). ZL-15T specific contribution: 30% water savings vs baseline supporting 2-4 LEED points.

How does ZL-15T support LEED Indoor Environmental Quality credits?

ZL-15T supports LEED v4 EQ credits: EQ Credit Minimum Indoor Air Quality (drift eliminator reduces plume humidity), EQ Prerequisite Minimum IAQ Performance (cooling tower plume dispersion analysis). ZILLION provides plume dispersion modeling per ASHRAE Guideline 1 for projects requiring plume control within property setbacks.

Does ZL-15T comply with ASHRAE 90.1 for HVAC system efficiency?

ZL-15T complies with ASHRAE 90.1-2016 baseline cooling tower performance: 38.2 gpm/RT flow rate (ZL-15T: 34.4 gpm/RT = 10% better), 3.0 kW/RT fan power (ZL-15T: 0.037 kW/RT = 99% better). Energy modeling input data for ASHRAE 90.1 compliance documentation available with engineering specifications.

What green building rating systems recognize ZL-15T?

ZL-15T performance data recognized by: LEED v4 (US Green Building Council), BREEAM (UK Building Research Establishment), Green Star (Australia), WELL Building Standard (water and energy components), EDGE (IFC green building certification). ZILLION provides country-specific green building documentation packages.

How does ZL-15T support sustainable HVAC design philosophy?

ZL-15T aligns with sustainable HVAC principles: minimum energy consumption (0.037 kW/RT class-leading), minimum water consumption (0.005% drift loss), minimum chemical consumption (cycles 5-7 with optimized treatment), maximum service life (15-20 years FRP), recyclability (80% end-of-life materials). EPC contractors cite these metrics in sustainability narratives.


Why ZL-15T from ZILLION

Zillion has supplied industrial cooling towers since 2009, with FRP counter flow construction as our standard since 2014. The ZL-15T's 11.7 m3/h flow at 5C range and 52.75 kW heat rejection cover the 15-ton process cooling capacity class at 0.37 kW fan power — the lowest power consumption per ton in our ZL series.

  • FRP shell and ABS fan construction, 15-20 year service life
  • Counter flow geometry with 5C approach at design WB 27C
  • Compact 1180 x 1180 mm footprint, 54 kg dry weight enables rooftop installation
  • CE certified for global deployment, 380V 3-phase 50Hz standard
  • 1-year warranty on all components

Contact: Leika Li, +86 185 2053 2504, Leika@gdzillion.cn. Factory: Building 103-B, Yi'an Industrial Park, Fenggang Town, Dongguan, Guangdong, China.


Related ZL-15T Cooling Tower Variants

From hvac epc contractor to other buyer perspectives, the ZL-15T platform reports across ten sustainability contexts:


Related Industrial Cooling Equipment from ZILLION


Complementary Equipment for Closed-Loop Plastic Processing

Send A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Related Products

ZL-CT40 Industrial Round Cooling Tower 40T FRP | industrial cooling solution | CE Certified
Industrial Fiberglass FRP GRP Counter Flow Cooling Tower Price Round FRP Cooling Tower 40T

Quick Specs: ZL-CT40 industrial round cooling tower with 40-ton cooling capacity, FRP material, counter-flow design, 1.5kW fan, CE certified. Best for industrial chiller systems and mid-scale manufacturing. The water cooling tower is a device used for cooling circulating water. By exchanging heat between hot water and air, the water temperature is reduced, thus realizing the repeated use of circulating water. Water cooling towers are widely used in industrial production, air conditioning systems and other fields, and are of great significance for saving water resources and reducing energy consumption.  

ZL-CT60 Round Shape Water Cooling Tower 60T | industrial cooling solution | CE Certified
60T Round Shape Water Cooling Tower for Chiller Counter Flow Circular Cooling Tower Industrial Cooling System FRP Competitive Price

Quick Specs: ZL-CT60 round shape water cooling tower with 60-ton capacity, counter-flow design, FRP material, 1.5kW fan, CE certified. Best for industrial chiller systems and large-scale cooling. A water cooling tower is a device used for cooling industrial water or other liquids. Its main function is to cool down hot water through heat exchange between hot water and air so that the cooled water can be recycled.      

ZL-CT100 FRP Round Cooling Tower 100T | 100 ton capacity | CE Certified
FRP Material 100 Ton Round Cooling Tower Price

Quick Specs: ZL-CT100 FRP round cooling tower with 100-ton cooling capacity, FRP material, 2.2kW fan, CE certified. Best for large-scale industrial cooling and high-capacity chiller systems. The counterflow cooling tower is a common type of cooling tower. It sprays hot water from top to bottom and air flows from bottom to top, enabling hot water and air to exchange heat in the packing, thereby reducing the water temperature. The counterflow cooling tower has the advantages of high cooling efficiency, compact structure and small floor area, and is widely used in industrial production, air conditioning and refrigeration and other fields.    

ZL-CT Square Drop Counter-Flow Cooling Tower FRP
Square Cooling Tower for Water Cooling: High - temperature Square Drop Counter - flow FRP and Open Cooling Towers

Quick Specs: ZL-CT square drop counter-flow cooling tower with FRP material, multiple capacity options, CE certified. Best for high-temperature industrial water cooling and open cooling tower applications. The square cooling tower has the advantages of small floor area, beautiful appearance, and convenient installation. It is widely used in fields such as air conditioning and refrigeration and industrial cooling, providing effective cooling guarantee for the normal operation of various equipments.      

ZL-CT Industrial Cooling Tower Multiple Types High Efficiency | industrial cooling solution | CE Certified
Factory Direct High-Efficiency Industrial Cooling Tower Multiple Types Available

Quick Specs: ZL-CT factory-direct industrial cooling tower with multiple types and capacities, high-efficiency design, CE certified. Best for industrial cooling applications and large-scale manufacturing. A cooling tower dissipates heat from industrial or air - conditioning systems. Its working principle involves spraying hot water onto packing to form a water film, while air flow carries away heat from the water to lower its temperature. The cooled water is recyclable, saving water resources and reducing costs.​ There are various types, such as open and closed cooling towers. Open ones contact outside air directly, making water prone to contamination but with lower costs. Closed ones have water circulating in sealed pipes, ensuring cleaner water but usually at a higher price.​ Cooling towers play a key role in fields like power plants, chemical plants, and data centers, helping maintain system operation and improve energy utilization efficiency.​  

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for cfo procurement | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for CFO Procurement

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for cfo procurement applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications Factory direct pricing EXW Dongguan with T/T, L/C, Western Union payment terms. 1-year warranty and bulk discount at 5/10/20 unit tiers. Lowest capacity entry point for ZILLION counter flow cooling tower line. Total cost of ownership over 10-year lifecycle shows 18 percent lower annual cooling energy cost versus adiabatic systems. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for maintenance technician | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for Maintenance Technician

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for maintenance technician applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications Routine service schedule: weekly water quality check, monthly float valve inspection, quarterly fill media inspection, annual fan motor bearing service. Direct-drive 0.37 kW motor with single-phase fan configuration. Spare parts inventory: 0.37 kW fan motor, float valve assembly, fill media sections. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

ZILLION ZL-10T 10-ton industrial FRP counter flow cooling tower for hvac epc contractor | 35.2 kW heat rejection | 10 ton capacity | CE Certified
ZL-10T 10 Ton Industrial FRP Counter Flow Cooling Tower for HVAC EPC Contractor

Overview The ZL-10T is a 10-ton (35.2 kW) industrial FRP counter flow cooling tower purpose-built for hvac epc contractor applications. ZILLION engineered this 10-ton counter flow cooling tower with CE ISO 9001:2015 certification and quality construction for long service life in compact industrial installations. Key Specifications Cooling capacity: 35.2 kW (10 refrigeration ton) Water flow rate: 7.81 m3/h (130 L/min) design flow Heat rejection: 5 deg C approach to wet-bulb at 27 deg C design Fan airflow: 85 CMM at 635 mm fan diameter Motor power: 0.37 kW (0.5 HP) at 380V 3-phase 50 Hz Head loss: 13 kPa at design flow Dry weight: 46 kg, operating weight: 190 kg Overall dimensions: H1820 x Dia940 mm Design Features FRP counter-flow shell for corrosion resistance and long service life ABS plastic fan blade for low maintenance and quiet operation IP55 Class F insulation for harsh industrial environments Counter flow square configuration for maximum heat transfer efficiency Low-drift eliminator reduces water loss to 0.01 percent of circulation Applications IP55 Class F insulation, CE ISO 9001:2015 certified for small HVAC chiller condenser water loop integration. Compact 1820 x 940 mm footprint fits standard equipment room layouts. Submittal package: thermal performance curve, dimensional drawing, electrical schematic, O&M manual. Project delivery 15-25 days for bulk orders. Contact ZILLION Today Get a quote for the ZL-10T cooling tower from ZILLION factory direct. Contact our engineering team for factory pricing, thermal performance curves, technical specifications, and bulk discount tiers for your project requirements.

If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Home

Products

About Us

Whatsapp